Checking the electrical connections and the travel path, Configuration and parameterisation, Data backup and documentation, Introduction to the Festo Automation Suite software, Remote support during commissioning of 1-axis systems with a safety module, System test
Work involved on site
3 working hours
Customer requirements
24 V logic and 230/400 V load voltage must be made available, Local administrator rights, Local installation of FFT software (see Support Portal), Local installation of TeamViewer or Bomgar communication software, Qualified personnel responsible for the machine present on the agreed date, Stable Internet connection, Switch and Ethernet cable must be available, YJKP kit must be assembled mechanically